Monthly Crude oil production Report for October,2020
Crude oil production[1] during October,2020 was2567.70 TMT which is7.10% lower than target and6.24% lower when compared with October2019.Cumulative crude oil production during April-October, 2020 was 17940.49 TMT which is 5.0% and 6.12% lower than target for the period and production during corresponding period of last year respectively.Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of October, 2020 and cumulatively for the period April-October, 2020 vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company | Target | October (Month) | April-October (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
ONGC | 20931.54 | 1784.43 | 1707.03 | 1712.95 | 99.65 | 12283.81 | 11860.92 | 11965.08 | 99.13 |
OIL | 3268.00 | 279.92 | 256.73 | 272.57 | 94.19 | 1841.94 | 1742.14 | 1886.83 | 92.33 |
PSC Fields | 8265.00 | 699.45 | 603.95 | 752.94 | 80.21 | 4759.52 | 4337.42 | 5258.52 | 82.48 |
Total | 32464.53 | 2763.80 | 2567.70 | 2738.46 | 93.76 | 18885.27 | 17940.49 | 19110.43 | 93.88 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC in nomination block during October, 2020 was 1707.03 TMT which is 4.34%lower than target and0.35%lower when compared with October 2019. Cumulative crude oil production by ONGC during April-October, 2020 was 11860.92 TMT which is 3.44%and 0.87% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production planned from WO16 cluster could not be realized due to delay in MOPU (Sagar Samrat) as activities at GPC yard Abu Dhabi got affected due to Covid restrictions/lockdown
- Production planned from new wells in Ratna field affected due to non- availability of Electrical Submersible Pumps for well completion due to implications of COVID-19
- New wells planned under Cluster 8 development project delayed due to toppling of D-30-2 platform jacket during installation and further delay in installation of new platforms due to COVID implications.
-
- Crude oil production by OIL in the nominationblock during October, 2020 was256.73 TMT which is 8.28% lower than the monthly target and 5.81% lower than the October, 2019. Cumulative crude oil production by OIL during April-October, 2020 was 1742.14 TMT which is 5.42% and 7.67% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells, drilling wells and old wells.
- Rise in water cut and decline in liquid production from existing wells.
- Bandhs /blockade by local people and associations etc. after the Baghjan Blowout, protests/agitation etc.
-
- Crude oil production by Pvt/JVscompanies in the PSC (production sharing contract) regime during October,2020 was 603.95 TMT which islower by 13.65% than the monthly target and 19.79%lowerthanOctober, 2019.Cumulative crude oil production by Pvt/JVs companies during April-October, 2020 was 4337.42 TMT which is 8.87% and 17.52% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1(CEIL): (1) Mangala: – Major elements brought online in the last week of October, Slug catcher and sections of productions lines are to be hooked up. (2) Bhagyam: Artificial lift malfunction. Delayed polymer injection. Addl. Downtime-Over Head Line/Grid failures. (3) Aishwarya: Delayed polymer injection. Additional downtime due to Electrical Submersible Pump failures in few wells. (4) ABH: Delay in hook-up of ABH Stage-2 wells. (5) Satellite Fields: Failure or flow cease in few wells. (6) Tukaram & Kaam-1: Well and Surface Facility construction schedule impacted by COVID-19.
- RAVVA (CEIL): Ullage problem due to Production reduced causing kink in Hose pipe in Aug-2020. Production reduced by 50% for few days in October 2020. Rectification job ongoing.
- CB-ONN-2003/1 (ONGC): Deviation due to non-acceptance of crude by Off the Shelf (OTS) Ravva (ullage problem).
- CB-ONN-2000/1 (GSPC): Well PK#2 became non-producing in Dec-2019 due to possible casing damage and reservoir issues. Well SE_DEV#1, SE#1A and SE1#A1 is shut-in due to unavailability of effective demulsifier to break tight water and oil emulsion.
- CY-ONN-2002/2 (ONGC): Well MDDD couldn’t be drilled and completed because of local agitation.
- Production of Natural Gas
Natural gas production during October,2020 was 2418.88MMSCM which is 18.20% lower than the monthly target and 8.41% lower when compared with October, 2019. Cumulative natural gas production during April-October, 2020 was 16372.77MMSCM which is 13.90% and 12.19% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of October, 2020 and cumulatively for the period April-October, 2020 vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (inMMSCM)
Oil Company | Target | October (Month) | April-October (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
ONGC | 24437.08 | 2061.06 | 1883.75 | 1954.35 | 96.39 | 14293.51 | 12863.07 | 14026.06 | 91.71 |
OIL | 3181.54 | 289.74 | 222.48 | 239.23 | 93.00 | 1850.13 | 1464.28 | 1623.61 | 90.19 |
PSC Fields | 6826.82 | 606.20 | 312.64 | 447.46 | 69.87 | 2871.99 | 2045.42 | 2996.49 | 68.26 |
Total | 34445.44 | 2957.00 | 2418.88 | 2641.04 | 91.59 | 19015.63 | 16372.77 | 18646.15 | 87.81 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nominationblocks during October, 2020 was 1883.75MMSCM which is 8.60% lower than target and 3.61% lower when compared with October 2019. Cumulative natural gas production by ONGC duringApril-October, 2020 was 12863.07 MMSCM which is 10.01% and 8.29% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Closure of Gas wells in western offshore due to Hazira Plant shutdown on 24.09.20 and subsequent normalization.
- Less Gas production from WO16 cluster due to delay in MOPU and non-realization of gain planned from new subsea wells in Bassein field due to delay in subsea umbilical connections/hook up jobs in view of Covid-19 implications.
- Less than planned production from Vasistha/S1 wells in EOA due certain reservoir related issues.
-
- Natural gas production by OILin the nomination block during October, 2020 was 222.48 MMSCM which is 23.21% lower than monthly target and 7.0% lower than October, 2019. Cumulative natural gas production by OIL during April-October, 2020 was 1464.28 MMSCM which is 20.85% and 9.81% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Low upliftment/demand of gas by the major customers.
- Bandhs /blockade by local people and associations etc. after the Baghjan Blowout, protests/agitation etc.
-
- Natural gas production by Pvt/JVs companiesin the PSC (production sharing contracts) regime during October,2020 was 312.64MMSCM which is 48.43% lowerthan monthly target and30.13% lower than October, 2019. Cumulative natural gas production by Pvt/JVs during April-October, 2020 was 2045.42MMSCM which is 28.78% and 31.74% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- KG-DWN-98/3 (RIL): D-34 production commencement delayed due to COVID 19 pandemic. Production expected to commence in Nov End ’2020.
- RJ-ON/6 (FEL): Power Plant customer has further reduced gas off take as one of the Gas turbine is on emergency shutdown.
- RJ-ON-90/1 (CEIL): RDG – Delay in new Raageshwari Deep Gas (RDG) start up due to Covid-19.
- KG-DWN-98/2 (ONGC): Less Gas production from well due to reduction of choke. (ONGC)
- Raniganj East (ESSAR): Production curtailed due to limited sales off-take.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during October, 2020 was 18389.27TMT which is 15.26% lower than the target for the month and16.13% lowerwhen compared with October, 2019. Cumulative crude throughput during April-October, 2020 was118555.33 TMT which is 18.41% and 19.71% lower than target for the period and crude throughput during corresponding period of last year respectively.Refinery-wise details of the crude throughput and capacity utilization during the month of October, 2020 vis-à-vis October, 2019 are given at Annexures-III and Annexures -IV. Company-wise crude throughput for the month of October, 2020 and cumulatively for the period April-October, 2020vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed(Crude Throughput) (in TMT)
Oil Company | Target | October (Month) | April-October (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
CPSE | 148031.12 | 12782.65 | 10763.45 | 12473.31 | 86.29 | 84186.56 | 65396.27 | 83657.71 | 78.17 |
IOCL | 72499.86 | 6565.53 | 5662.06 | 6042.68 | 93.70 | 41651.68 | 32561.32 | 40862.90 | 79.68 |
BPCL | 30499.95 | 2733.57 | 2116.95 | 2679.46 | 79.01 | 17888.79 | 12781.12 | 17884.98 | 71.46 |
HPCL | 17867.47 | 918.94 | 1288.84 | 1388.35 | 92.83 | 10107.83 | 9321.98 | 9872.82 | 94.42 |
CPCL | 9000.00 | 930.00 | 725.26 | 711.09 | 101.99 | 4470.00 | 4108.58 | 5899.85 | 69.64 |
NRL | 2700.00 | 229.00 | 232.23 | 246.41 | 94.24 | 1582.00 | 1500.61 | 1640.77 | 91.46 |
MRPL | 15400.00 | 1400.00 | 731.02 | 1397.96 | 52.29 | 8450.00 | 5077.96 | 7445.37 | 68.20 |
ONGC | 63.83 | 5.61 | 7.10 | 7.37 | 96.36 | 36.27 | 44.70 | 51.02 | 87.62 |
JVs | 14772.00 | 1236.00 | 1599.32 | 1771.04 | 90.30 | 8535.00 | 9239.89 | 11411.12 | 80.97 |
BORL | 7800.00 | 660.00 | 561.14 | 666.67 | 84.17 | 4560.00 | 3072.32 | 4445.74 | 69.11 |
HMEL | 6972.00 | 576.00 | 1038.18 | 1104.36 | 94.01 | 3975.00 | 6167.58 | 6965.39 | 88.55 |
Private | 89515.16 | 7681.81 | 6026.50 | 7681.81 | 78.45 | 52585.59 | 43919.17 | 52585.59 | 83.52 |
RIL | 68894.99 | 5897.66 | 5463.71 | 5897.66 | 92.64 | 40400.68 | 34440.56 | 40400.67 | 85.25 |
NEL | 20620.18 | 1784.16 | 562.79 | 1784.16 | 31.54 | 12184.92 | 9478.61 | 12184.92 | 77.79 |
TOTAL | 252318.28 | 21700.46 | 18389.27 | 21926.16 | 83.87 | 145307.16 | 118555.33 | 147654.43 | 80.29 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during October, 2020 was 10763.45TMT which is 15.80% lower than the target for the month and13.71%lowerwhen compared with October, 2019.Cumulative crude throughputby CPSE refineries during April-October, 2020 was 65396.27TMT which is 22.32% and 21.83% lower than target for the period and crude throughputduring corresponding period of last year respectively.Reasons for shortfall in production are as under:
- IOCL-Barauni, Koyali, Haldia, Mathura, Panipat and Paradip: Crude processed regulated for low product demand due to COVID impact.
- HPCL-Mumbai: Crude processed lower due to major power disturbance in Mumbai resulting in shutdown of primary and secondary units.
- HPCL-Visakh: Crude processed lower due to unplanned shutdown of secondary unit.
- CPCL-Manali &MRPL-Mangalore: Crude processed lower due to Lower demand due to impact of COVID-19 lockdown.
3.2 JV refineries’ crude oil processed during October, 2020 was 1599.32TMT which is 29.39% higher than the target for the month but 9.70% lower when compared with October, 2019. Cumulative crude throughput during April-October, 2020 was9239.89 TMT which is 8.26% higher than target for the period but19.03% lower when compare with the corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during October, 2020 was 6026.50TMT which is 21.55% lower than the corresponding month of last year. Cumulative crude throughputduring April-October, 2020 was 43919.17 TMT which is 16.48% lower than thecorresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during October, 2020 was 18876.54 TMT which is 15.44% lower than the target for the month and 16.97% lower when compared with October, 2019. Cumulative production during April-October, 2020 was 126165.06 TMT which is 14.97% and 16.37% lower than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of October, 2020 and cumulatively for the period April-October, 2020 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
-
- Production of petroleum Products by Oil’s Refineries during October, 2020 was 18513.65 TMT which is 15.59% lower than the target for the month and 17.07% lower when compared with October, 2019. Cumulative production of petroleum products by refineries during April-October, 2020 was 123714.97 TMT which is 15.07% and 16.45% lower than target for the period and production during corresponding period of last year respectively.
-
- Production of petroleum Products by Fractionators during October, 2020 was 362.89 TMT which is 6.81% lower than the target for the month and 11.45% lower when compared with October, 2019. Cumulative production by Fractionators during April-October, 2020 was 2450.09 TMT which is 9.64% and 11.90% lower than target for the period and production during corresponding period of last year respectively.
Table 4: Production of Petroleum Products (TMT)
Oil Company | Target | October (Month) | April-October (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
CPSE | 139203.86 | 12030.97 | 10348.46 | 11886.45 | 87.06 | 79205.03 | 61986.54 | 78809.19 | 78.65 |
IOCL | 68912.87 | 6255.07 | 5576.39 | 5815.09 | 95.90 | 39587.80 | 31265.23 | 38830.53 | 80.52 |
BPCL | 28965.13 | 2583.27 | 2027.50 | 2651.43 | 76.47 | 17000.52 | 12277.93 | 16913.79 | 72.59 |
HPCL | 16438.97 | 840.28 | 1127.25 | 1325.34 | 85.05 | 9302.60 | 8666.78 | 9187.12 | 94.34 |
CPCL | 8278.87 | 862.88 | 701.65 | 635.35 | 110.44 | 4075.99 | 3756.69 | 5423.16 | 69.27 |
NRL | 2660.91 | 226.00 | 258.82 | 238.76 | 108.40 | 1560.10 | 1518.65 | 1586.94 | 95.70 |
MRPL | 13887.11 | 1258.21 | 650.01 | 1213.79 | 53.55 | 7643.93 | 4458.39 | 6820.12 | 65.37 |
ONGC | 60.00 | 5.27 | 6.84 | 6.70 | 102.14 | 34.09 | 42.86 | 47.55 | 90.15 |
JVs | 13590.40 | 1136.48 | 1513.02 | 1671.06 | 90.54 | 7850.68 | 8612.19 | 10662.68 | 80.77 |
BORL | 6958.40 | 588.48 | 510.95 | 600.20 | 85.13 | 4068.68 | 2659.77 | 4063.39 | 65.46 |
HMEL | 6632.00 | 548.00 | 1002.07 | 1070.86 | 93.58 | 3782.00 | 5952.42 | 6599.30 | 90.20 |
Private | 102154.50 | 8766.05 | 6652.17 | 8766.05 | 75.89 | 58603.85 | 53116.24 | 58603.85 | 90.64 |
RIL | 82374.12 | 7029.68 | 6181.87 | 7029.68 | 87.94 | 46916.11 | 44025.96 | 46916.11 | 93.84 |
NEL | 19780.38 | 1736.37 | 470.31 | 1736.37 | 27.09 | 11687.74 | 9090.28 | 11687.74 | 77.78 |
Total Refinery | 254948.76 | 21933.50 | 18513.65 | 22323.55 | 82.93 | 145659.56 | 123714.97 | 148075.72 | 83.55 |
Fractionators | 4572.73 | 389.42 | 362.89 | 409.80 | 88.55 | 2711.48 | 2450.09 | 2781.03 | 88.10 |
TOTAL | 259521.49 | 22322.91 | 18876.54 | 22733.35 | 83.03 | 148371.04 | 126165.06 | 150856.75 | 83.63 |
Note: 1. Target for the year 2020-21 is provisional, subject to finalization. *: Provisional
2. Totals may not tally due to rounding off.
Figure 4: Monthly Refinery Production of Petorleum Products