Monthly Production Report for March, 2021
- Production of Crude Oil
Crude oil production during March, 2021 was 2612.96 TMT which is 5.63% lower than target and 3.13% lower when compared with March, 2020.Cumulative crude oil production during April-March, 2020-21 was 30491.77 TMT which is 5.65% and 5.22% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and State-wise crude oil production is given at Annexure-I. Unit-wise crude oil production for the month of March, 2021 and cumulatively for the period April-March, 2020-21vis-à-vis same period of last year has been shown in Table-1 and month-wise in Figure-1.
Table-1: Crude Oil Production (in TMT)
Oil Company | Target | March (Month) | April-March (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
ONGC | 20931.68 | 1768.12 | 1713.08 | 1778.11 | 96.34 | 20931.68 | 20182.75 | 20626.95 | 97.85 |
OIL | 3121.00 | 272.49 | 249.61 | 254.07 | 98.25 | 3121.00 | 2937.37 | 3106.61 | 94.55 |
PSC Fields | 8265.00 | 728.15 | 650.26 | 665.28 | 97.74 | 8265.00 | 7371.65 | 8436.19 | 87.38 |
Total | 32317.68 | 2768.76 | 2612.96 | 2697.45 | 96.87 | 32317.68 | 30491.77 | 32169.76 | 94.78 |
Note: Totals may not tally due to rounding off.*: Provisional
Figure-1: Monthly Crude Oil Production
Unit-wise production details with reasons for shortfall are as under:
-
- Crude oil production by ONGC(Oil and Natural Gas Corporation) in nomination block during March, 2021 was 1713.08 TMT which is 3.11%lower than target and 3.66%lower when compared with March 2020. Cumulative crude oil production by ONGC during April-March, 2020-21 was 20182.75 TMT which is 3.58%and 2.15% lower than target for the period andproduction during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Production planned from WO16 cluster from June’20 could not be realized due to delay in MOPU (SagarSamrat) as activities at GPC yard Abu Dhabi got affected due to Covid restrictions/lockdown
- New wells planned under Cluster 8 development project delayed due to delay in installation of new platforms due to COVID implications
-
- Crude oil production by OIL(Oil India Ltd) in the nomination block during March, 2021 was 249.61 TMT which is8.40% lower than target and 1.75% lower when compared with March 2020. Cumulative crude oil production by OIL during April-March, 2020-21 was 2937.37 TMT which is 5.88% and 5.45% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Less than planned contribution from workover wells, drilling wells and old wells.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Crude oil production by Pvt/JVscompanies in the PSC (Production Sharing Contract) regime during March, 2021 was 650.26 TMT which is 10.70% lower than target and 2.26% lower when compared with March 2020. Cumulative crude oil production by Pvt/JVs companies during April-March, 2021 was 7371.65 TMT which is 10.81% and 12.62% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- RJ-ON-90/1 (Cairn Energy India Ltd): Delayed start up full field polymer injection in Bhagyam and Aishwarya field. Delay in hook-up of Stage-2 wells and NA-1 processing facility commissioning in advance stage in ABH. Flow cease in few wells of Satellite fields. Project schedule of Well and Surface Facility of Tukaram, Kaam-1 and GSV Condensate is impacted by COVID-19.
- B-80 (Hindustan Oil Exploration Company Ltd): Production from B80 field not commenced due to delay in completion of field development activities because of COVID.
- RAVVA (Cairn Energy India Ltd): Decline in production from producer wells.
- PY-3 (HARDY): Production could not be commenced in PY-3 field due to intra-JV issues.
- CB-ONN-2005/9 (MERCATOR): Block under PI transfer request and National Company Law Tribunal proceedings.
- Production of Natural Gas
Natural Gas production during March,2021 was 2683.90 MMSCM which is 11.11% higher when compared with March, 2020 but 15.11% lower than the monthly target. Cumulative natural gas production during April-March, 2020-21 was 28670.60 MMSCM which is 14.60% and 8.06% lower than target for the period and production during corresponding period of last year respectively. Unit-wise and state-wise natural gas production is given at Annexure-II. Unit-wise natural gas production for the month of March, 2021 and cumulatively for the period April-March, 2020-21vis-à-vis same period of last year has been shown in Table-2 and month-wise in Figure-2.
Table-2: Natural Gas Production (inMMSCM)
Oil Company | Target | March (Month) | April-March (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
ONGC | 23982.98 | 2049.98 | 1831.74 | 1905.52 | 96.13 | 23982.98 | 21871.94 | 23746.19 | 92.11 |
OIL | 2761.73 | 261.47 | 210.09 | 211.62 | 99.28 | 2761.73 | 2479.73 | 2668.25 | 92.93 |
PSC Fields | 6826.82 | 850.27 | 642.07 | 298.29 | 215.25 | 6826.82 | 4318.93 | 4769.78 | 90.55 |
Total | 33571.53 | 3161.72 | 2683.90 | 2415.43 | 111.11 | 33571.53 | 28670.60 | 31184.22 | 91.94 |
Note: Totals may not tally due to rounding off. *: Provisional
Figure-2: Monthly Natural Gas Production
-
- Natural gas production by ONGC in the nomination blocks during March, 2021 was 1831.74 MMSCM which is 10.65% lower than target and 3.87%lower when compared with March 2020. Cumulative natural gas production by ONGC during April-March, 2020-21 was 21871.94 MMSCM which is 8.80% and 7.89% lower than target for the period and production during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- Less Gas production from WO16 cluster due to delay in mobilization of MOPU (SagarSamrat)
- Less than planned production from Vasistha/S1 wells in EOA due certain reservoir related issues/high liquid.
- Less than envisaged production from Daman-Tapti Block.
- Less gas intake by Uran Plant due to maintenance job.
-
- Natural gas production by OILin the nomination block during March, 2021 was 210.09 MMSCM which is 19.65% lower than monthly target and 0.72% lower than the March, 2020. Cumulative natural gas production by OIL during April-March, 2020-21 was 2479.73 MMSCM which is 10.21% and 7.07% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- Low upliftment/demand of gas by the major customers.
- Bandhs /blockade by local people and associations after the Baghjan Blowout.
-
- Natural gas production by Pvt/JVs companies in the PSC (production sharing contracts) regime during March,2021 was 642.07 MMSCM which is 115.25% higher than the March, 2020 due to new field D-34 (KG 98/3) started production in Dec-2020 with 1.3 MMSCMD, ramped up to 9.6 MMSCMD in March-2021 but total production by Pvt/JVs companies during March, 2021 is 24.49% lower than monthly target. Cumulative natural gas production by Pvt/JVs during April-March, 2020-21 was 4318.93 MMSCM which is 36.74% and 9.45% lower than target for the period and production during corresponding period of last year respectively. Reasons for shortfall in production are as under:
- KG-DWN-98/2 (Oil & Natural Gas Corpn.): U3-B well is flowing less than the expected profile and delay in commissioning of Wells of U1-field.
- KG-DWN-98/3 (Reliance Industries Ltd): As production commencement from R-Cluster (D34) field of KG-DWN-98/3 was delayed due to COVID from June 2020 to December 2020 which hampered the gradual ramp-up of Gas production.
- RJ-ON/6 (Focus Energy Limited): Reduced Gas offtake by buyer.
- Raniganj East (Essar Oil and Gas Exploration & Production Ltd): Production is lower due to less sales off-take.
- KG-OSN-2001/3 (Oil & Natural Gas Corpn.): Well D7 is planned to be safely abandoned.
- Crude Oil Processed (Crude Throughput)
Crude Oil Processed during March, 2021 was 20985.28 TMT which is 2.90% lower than the target for the month and 1.03% lower than March, 2020.Cumulative crude throughput during April-March, 2020-21 was 221773.19 TMT which is 11.88% and 12.82% lower than target for the period and crude throughput during corresponding period of last year respectively. Refinery-wise details of the crude throughput and capacity utilization during the month of March, 2021 vis-à-vis March, 2020 are given at Annexure-III and IV. Company-wise crude throughput for the month of March, 2021 and cumulatively for the period April-March, 2020-21vis-à-vis same period of last year has been shown in Table-3 and month-wise in Figure-3.
Table 3: Crude Oil Processed (Crude Throughput) (in TMT)
Oil Company | Target | March (Month) | April-March (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
CPSE | 147377.43 | 12940.56 | 12841.38 | 12261.68 | 104.73 | 147377.44 | 127503.48 | 144715.80 | 88.11 |
IOCL | 72400.04 | 6553.62 | 5926.90 | 5736.13 | 103.33 | 72400.04 | 62350.64 | 69419.36 | 89.82 |
BPCL | 33000.00 | 2851.00 | 2759.80 | 2706.52 | 101.97 | 33000.00 | 26222.38 | 31532.11 | 83.16 |
HPCL | 16999.28 | 942.06 | 1581.12 | 1514.89 | 104.37 | 16999.28 | 16424.68 | 17180.32 | 95.60 |
CPCL | 10290.00 | 920.00 | 963.54 | 853.19 | 112.93 | 10290.00 | 8242.89 | 10160.64 | 81.13 |
NRL | 2549.86 | 218.27 | 240.90 | 247.65 | 97.28 | 2549.86 | 2707.35 | 2383.34 | 113.59 |
MRPL | 12074.42 | 1450.00 | 1361.39 | 1196.68 | 113.76 | 12074.42 | 11474.55 | 13953.11 | 82.24 |
ONGC | 63.83 | 5.61 | 7.72 | 6.63 | 116.39 | 63.83 | 80.99 | 86.93 | 93.17 |
JVs | 14772.00 | 1428.00 | 1627.18 | 1698.07 | 95.83 | 14772.00 | 16261.63 | 20154.97 | 80.68 |
BORL | 7800.00 | 660.00 | 602.13 | 733.21 | 82.12 | 7800.00 | 6189.63 | 7912.91 | 78.22 |
HMEL | 6972.00 | 768.00 | 1025.05 | 964.86 | 106.24 | 6972.00 | 10072.00 | 12242.06 | 82.27 |
Private | 89515.16 | 7243.95 | 6516.72 | 7243.95 | 89.96 | 89515.16 | 78008.07 | 89515.16 | 87.15 |
RIL | 68894.99 | 5524.94 | 4889.94 | 5524.94 | 88.51 | 68894.99 | 60940.96 | 68894.99 | 88.45 |
NEL | 20620.18 | 1719.01 | 1626.78 | 1719.01 | 94.63 | 20620.18 | 17067.11 | 20620.18 | 82.77 |
TOTAL | 251664.61 | 21612.51 | 20985.28 | 21203.70 | 98.97 | 251664.61 | 221773.19 | 254385.94 | 87.18 |
Note: Totals may not tally due to rounding off.*: Provisional
Figure 3: Crude Oil Processed (Crude Throughput)
3.1 CPSE Refineries’ crude oil processed during March, 2021 was 12841.38 TMT which is 4.73% higher than the target for the month but 0.77% lower when compared with March, 2020.Cumulative crude throughput by CPSE refineries during April-March, 2020-21 was 127503.48 TMT which is 13.49% and 11.89% lower than target for the period and crude throughput during corresponding period of last year respectively.Reasons for shortfall in production are as under:
- IOCL-Barauni: Crude processed as per product upliftment
- IOCL-Gujarat: Atmospheric Vacuum Unit (AVU-3) maintenance and installation shutdown, High Gas Oils (SRGO/RCO) stock and delayed commissioning of new Diesel Hydrotreating (DHDT)
- IOCL-Haldia: Crude processing regulated due to Hydrogen Generation Unit (HGU-2) interruption.
- IOCL-Digboi: Crude processed lower due maintenance and installation shutdown.
- IOCL-Panipat: Crude processed lower in line with product upliftment and old DHDT shutdown for Packinox tube bundle replacement.
- IOCL-Bongaigaon: Crude processed as per crude availability.
- NRL-Numaligarhi: Crude processed as per crude availability.
3.2 JV refineries’ crude oil processed during March, 2021 was 1627.18 TMT which is 13.95% higher than the target for the month but4.17% lower when compared with March, 2020. Cumulative crude throughput during April-March, 2020-21 was 16261.63 TMT which is 10.08% higher than target for the period but 19.32% lower when compare with the corresponding period of last year respectively.
3.3 Private refineries’ crude oil processed during March, 2021 was 6516.72 TMT which is 10.04% lower than the corresponding month of last year. Cumulative crude throughput during April-March, 2020-21 was 78008.07 TMT which is 12.85% lower than the corresponding period of last year.
- Production of Petroleum Products
Production of Petroleum Products during March, 2021 was 22753.18 TMT which is marginally higher by 0.01% than the target for the month but0.66% lower when compared with March, 2020. Cumulative production during April-March, 2020-21 was 233436.22 TMT which is 9.88% and 11.22% lower than target for the period and production during corresponding period of last year respectively. Unit-wise production of petroleum products is given at Annexure-V. Company-wise production for the month of March, 2021 and cumulatively for the period April-March, 2020-21 vis-à-Vis same period of last year has been shown in Table-4 and month-wise in Figure-4.
Figure 4: Monthly Refinery Production of Petroleum Products
Table 4: Production of Petroleum Products (TMT)
Oil Company | Target | March (Month) | April-March (Cumulative) | ||||||
2020-21 (Apr-Mar) | 2020-21 | 2019-20 | % over last year | 2020-21 | 2019-20 | % over last year | |||
Target | Prod.* | Prod. | Target | Prod.* | Prod. | ||||
CPSE | 138753.95 | 12154.07 | 12331.02 | 11951.00 | 103.18 | 138753.95 | 120927.70 | 137206.47 | 88.14 |
IOCL | 68760.50 | 6239.85 | 5741.84 | 5727.55 | 100.25 | 68760.50 | 59924.81 | 66668.28 | 89.89 |
BPCL | 31319.00 | 2686.00 | 2742.32 | 2700.45 | 101.55 | 31319.00 | 25124.09 | 30240.10 | 83.08 |
HPCL | 15914.53 | 869.12 | 1463.43 | 1368.70 | 106.92 | 15914.53 | 15360.45 | 15936.81 | 96.38 |
CPCL | 9527.02 | 855.28 | 903.64 | 795.74 | 113.56 | 9527.02 | 7576.37 | 9329.77 | 81.21 |
NRL | 2554.46 | 222.10 | 250.86 | 249.49 | 100.55 | 2554.46 | 2740.85 | 2299.89 | 119.17 |
MRPL | 10618.44 | 1276.45 | 1221.86 | 1102.88 | 110.79 | 10618.44 | 10124.25 | 12651.47 | 80.02 |
ONGC | 60.00 | 5.27 | 7.07 | 6.20 | 114.10 | 60.00 | 76.89 | 80.15 | 95.94 |
JVs | 13590.40 | 1318.48 | 1511.15 | 1611.07 | 93.80 | 13590.40 | 15073.37 | 18819.89 | 80.09 |
BORL | 6958.40 | 588.48 | 546.63 | 658.19 | 83.05 | 6958.40 | 5456.11 | 7218.74 | 75.58 |
HMEL | 6632.00 | 730.00 | 964.51 | 952.88 | 101.22 | 6632.00 | 9617.26 | 11601.15 | 82.90 |
Private | 102154.50 | 8949.50 | 8553.43 | 8949.50 | 95.57 | 102154.50 | 93222.97 | 102154.50 | 91.26 |
RIL | 82374.12 | 7302.54 | 6980.51 | 7302.54 | 95.59 | 82374.12 | 76683.16 | 82374.12 | 93.09 |
NEL | 19780.38 | 1646.96 | 1572.92 | 1646.96 | 95.50 | 19780.38 | 16539.81 | 19780.38 | 83.62 |
Total Refinery | 254498.86 | 22422.04 | 22395.60 | 22511.57 | 99.48 | 254498.85 | 229224.04 | 258180.85 | 88.78 |
Fractionators | 4523.28 | 329.33 | 357.59 | 392.74 | 91.05 | 4523.28 | 4212.18 | 4762.70 | 88.44 |
TOTAL | 259022.13 | 22751.37 | 22753.18 | 22904.31 | 99.34 | 259022.13 | 233436.22 | 262943.55 | 88.78 |
Note: Totals may not tally due to rounding off. *: Provisional
-
- Production of petroleum Products by Oil’s Refineries during March, 2021 was 22395.60 TMT which is 0.12% lower than the target for the month and 0.52% lower when compared with March, 2020. Cumulative production of petroleum products by refineries during April-March, 2020-21 was 229224.04 TMT which is 9.93% and 11.22% lower than target for the period and production during corresponding period of last year respectively.
-
- Production of petroleum Products by Fractionators during March, 2021 was 357.59 TMT which is 8.58% higher than the target for the month but 8.95% lower when compared with March, 2020. Cumulative production by Fractionators during April-March, 2020-21 was 4212.18 TMT which is 6.88% and 11.56% lower than target for the period and production during corresponding period of last year respectively.