IndiaMinistry of Power

Power Ministry takes active measures for power restoration work in the areas worst affected due to Cyclone Tauktae

Ministry of Power ( Secretary , Power) has been holding regular review meetings with the State Power Utilities , PGCIL , REC , POSOCO to provide as much assistance as possible to tide over the current critical situation  caused by Cyclone Tauktae.

Secretary Power took a special review meeting yesterday with a view to expediting the power restorations works in the State of Gujarat and the Union Territory of Diu, which have been the worst affected areas because of the Tauktae Cyclone. The meeting was attended  by ACS Energy Gujarat, CMD of PGCIL and President of IEEMA , amongst others.

PGCIL  informed that a team of 150 plus experienced manpower with ERS- Emergency Restoration System  (which can replace ten 220 kV towers ) has reached Gujarat and work has commenced to restore the worst affected 220 kV line providing power supply to Diu.

PGCIL also provided the list of contractors who could be contacted for the restoration works of the 66kV system. IEEMA assured that it would coordinate with the electrical equipment manufacturers and major contractors involved in erection of transmission lines for expediting the restoration works. The different State Governments also assured of providing necessary material and manpower for the restoration works.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Comment moderation is enabled. Your comment may take some time to appear.

Back to top button

Adblock detected

Please consider supporting us by disabling your ad blocker