Ministry of RailwaysIndia

Setting Up of Solar Panel in the Vacant Land of Railways

Indian Railways (IR) has planned to set up solar plants on its vacant land and along the tracks. As a part of this initiative, 4.7 Mega Watt (MW) land based Solar plants have already been commissioned. Action has been taken for installation of Solar power projects on unused Railway land at following locations:

  1. 50 Mega Watt (MW) at Bhilai (Chhattisgarh).
  2.  2 MW at Diwana (Haryana).

To further proliferate solar plants, IR has planned to install solar plants of 20  Giga Watt (GW) capacity by the year 2030 by utilizing its vacant land and to begin with, bids for 3 GW solar plants on vacant railway land parcels and land parcels along the railway track have already been invited.

This information was given by the Minister of Railways and Commerce & Industry, Shri Piyush Goyal in a written reply to a question in Rajya Sabha today.

Related Articles

Back to top button

Adblock detected

Please consider supporting us by disabling your ad blocker